Work has been completed to expand production capacity at Redruth-based seafood processor, Falfish.
In a two-phase project, Falfish’s dispatch and goods-in areas have been extended, while phase two, which is currently underway, will see the creation of new office space.
Falfish’s temperature-controlled dispatch area has been redesigned and extended, while a loading dock with recessed approach ramp was built on site to allow for simple access onto refrigerated despatch vehicles.
The work has been carried out by Somerset-based food industry construction specialist, ProjectLink.